The task was to design and install a manually operated depalletising and roundtable dosing unit in the bottling hall of First Craft Beer in Budapest. Empty cans arriving on UK pallets had to be conveyed to the receiving slot of the filling machine’s rinsing unit, with a buffer of about half an hour. The pallet was lifted by a high lift pallet lifter, the current top level was transferred to the roundtable by a manually operated transfer unit, which provided the buffer and the feeding in one step.
Auware Engeneering supplier conveyor construction completed
Production processes have been completed according to the approved plans. The track frames are constructed from an aluminium profile ladder structure to...